Ongoing projects

  • Suivi Prédictif de l’affluence des patients fragiles jeunes nourrissons ou âgés dans les services d’urgences pendant les épidémies virales hivernales. Proposition d’un indicateur détection précoce, de suivi temps réel et prédictif de l’évolution des flux.
    January 2016 to December 2020
  • Numérique et Optimisation pour une Mobilité Adaptée (FEDER)
    November 2017 to April 2020
  • analysis and resolution of the Generalized Assignment problem for Logistics Organization and Planning of working teams (SCUSI 2017)
    December 2017 to December 2019
  • Virtual Factory Open Operating System (H2020 FoF)
    January 2017 to December 2019
  • Un système de traçabilité cloud PLM support à la chaîne logistique durable de l'artisanat marocain
    January 2017 to December 2019
  • Protection de l’Hospitalisation à Domicile (ARC2 + Centre Hospitalier Soins et Santé)
    September 2015 to September 2018
  • CPS
    Ontology based decision model of in-home telerehabilitation system: from design to recycle (PHC CaiYuanpei)
    September 2016 to August 2018

Past projects

  • FUSION(Featured eUrope and South asIa mObility Network) is an EU (ERASMUS MUNDUS) project
    December 2013 to December 2017
  • Composites Haute Performance pour les applications ski et nautisme (FUI)
    June 2013 to June 2017
  • Systèmes de gestion de la traçabilité et de l'authentification des produits emballés dans du verre (FUI)
    January 2013 to January 2017
  • The THREATS project (FP7-CIPS) aims to increase the resilience of EU hospitals against terrorist attacks.
    July 2014 to December 2016
  • FAI
    Coordination of health care resources and logistics in case of major disasters (PHC TOURNESOL FL 2014)
    January 2014 to December 2016
  • CLink (ERUSMUS MUNDUS project) objective is to enhance the capacity for international cooperation between universities in the Asian and EU countries.
    August 2012 to August 2016
  • EASY-IMP is a FP7 European research project aiming to develop methodologies, tools and platforms for the design and production of personalised meta-products (product/services).
    September 2013 to July 2016
  • Sustainable collaborative networked organisations in the manufacturing area (PHC Germaine de Stael)
    January 2014 to December 2015
  • Mise en place d'un indicateur d'attente aux urgences (ARS-Rhône Alpes)
    November 2014 to November 2015
  • The mission of the FITMAN (Future Internet Technologies for MANufacturing industries - FP7) project is to provide the FI PPP Core Platform with 10 industry-led use case trials in the domains of Smart, Digital and Virtual Factories of the Future
    April 2013 to September 2015

Pages